Expert Bathroom Remodeling

Transform Your Bathroom into a Personal Spa

Complete bathroom transformations with expert tile work, plumbing, and premium fixtures.

Choose Your Style

Modern Spa

Modern Spa

Frameless glass
Rain shower
Floating vanity
Classic Elegance

Classic Elegance

Clawfoot tub
Marble surfaces
Traditional fixtures
Contemporary Luxury

Contemporary Luxury

Large format tiles
LED lighting
Smart features
Transitional Style

Transitional Style

Timeless design
Mixed materials
Versatile appeal

Select Your Remodel Scope

$8K-$12K

Powder Room Refresh

1-2 weeks
New vanity
Updated fixtures
Fresh tile/paint
Lighting upgrade
$15K-$25K

Full Bath Refresh

2-3 weeks
New vanity & countertop
Updated shower/tub
New tile work
Modern fixtures
$25K-$40K

Full Bath Remodel

4-6 weeks
Complete tear-out
Layout redesign
Custom tile work
Premium fixtures
New lighting
$40K-$80K

Master Suite Bath

6-8 weeks
Spa-like features
Custom everything
High-end materials
Smart technology
Designer finishes

Real Bathroom Transformations

Drag the slider to see the incredible before & after results

Spa-Style Bathroom Remodel

After
After
Before
Before
← Drag to compare →

Tile Options

Ceramic

$
Pros:
• Affordable
• Variety of styles
• Easy to clean
Cons:
• Can chip
• Grout maintenance

Porcelain

$$
Pros:
• Very durable
• Water resistant
• Low maintenance
Cons:
• Harder to cut
• Cost

Natural Stone

$$$
Pros:
• Unique look
• Elegant
• Increases value
Cons:
• Needs sealing
• More maintenance

Large Format

$$-$$$
Pros:
• Modern look
• Fewer grout lines
• Dramatic effect
Cons:
• Installation skill needed
• Cost

Fixture Quality Levels

Standard Fixtures

$$
Quality brands
Good warranties
Proven performance

Premium Fixtures

$$$
Designer brands
Enhanced features
Superior finish quality

Luxury Fixtures

$$$$
High-end designers
Smart technology
Lifetime warranties
Our Proven Process

What to Expect: Our Bathroom Remodel Process

A bathroom remodel requires precision — waterproofing, tile work, and plumbing all need to be perfect. Here's how we ensure your project goes smoothly.

1

Design Consultation

We meet in your home to discuss your goals, preferred style, and budget. We measure the space, assess plumbing and electrical layouts, and identify any structural considerations. We help you prioritize features that will make the biggest impact.

60–90 minutes
2

Design & Material Selection

We finalize the layout and help you select tile, vanity, countertops, shower system, fixtures, and lighting. We bring samples so you can see materials in your bathroom's actual lighting. We provide a clear timeline and pricing before moving forward.

1–2 weeks
3

Demolition & Rough-In

We carefully demolish the existing bathroom, protect surrounding areas from dust, and dispose of all debris. We then rough in new plumbing and electrical, relocate fixtures if the layout changes, and install the waterproofing system for showers and wet areas.

3–5 days
4

Tile & Finish Installation

We install tile with precise layout and spacing, set the vanity and countertop, install the shower system and fixtures, hang mirrors and accessories, and install lighting. Every detail is checked for level, alignment, and proper function.

1–2 weeks
5

Final Inspection & Walkthrough

We test all plumbing and fixtures, inspect tile work and grout, verify waterproofing, clean thoroughly, and walk you through your new bathroom. We provide care instructions and warranty information for all installed products.

2–4 hours
Completed Project

Bathroom Remodel Case Study

Here's an example of a bathroom remodel we completed for a homeowner in the Bay Area.

Master Suite Spa Bathroom

Los Gatos, CA·Single-family residence
Timeline

5 weeks

Investment

$38,000

Scope of Work

  • Gutted existing master bathroom to the studs
  • Reconfigured layout to accommodate a walk-in shower and freestanding tub
  • Installed custom vanity with quartz countertop and undermount sinks
  • Tiled walk-in shower with large-format porcelain tile and frameless glass enclosure
  • Installed rain shower head, handheld shower, and thermostatic temperature control
  • Installed heated floors, LED vanity lighting, and a backlit mirror

Key Results

  • Master bathroom transformed from dated to spa-like retreat
  • Walk-in shower with frameless glass created a sense of spaciousness
  • Heated floors added comfort on cool Bay Area mornings
  • Project completed in 5 weeks with family using the guest bath during construction

Project Highlights

  • Waterproofing system installed and flood-tested before tile installation
  • Large-format tile minimized grout lines for a clean, modern look
  • Custom vanity built to fit the space perfectly with matching storage towers
  • LED lighting and backlit mirror provided both function and ambiance
Frequently Asked Questions

Bathroom Remodel Questions Homeowners Ask

Here are the questions we hear most often before homeowners start a bathroom remodel.

A powder room refresh takes 1-2 weeks, a full bath refresh runs 2-3 weeks, and a complete bathroom remodel typically takes 4-6 weeks. Master suite bathrooms with custom tile and high-end fixtures can take 6-8 weeks. Tile installation and curing time are usually the longest phases. We provide a detailed timeline during your consultation.

Yes. If you have a second bathroom, you can continue using it throughout the project. We contain all dust and debris to the bathroom being remodeled using zip walls and floor protection. If the bathroom under construction is your only one, we can phase the work to keep essential facilities available as long as possible.

Walk-in showers with frameless glass enclosures are by far the most requested upgrade — they're modern, spacious, and add value. Other popular upgrades include heated floors, double vanities, rain shower heads, and large-format tile that reduces grout lines. During your consultation, we'll discuss which upgrades make the most sense for your space and budget.

Yes. We handle all permits, including plumbing and electrical, for bathroom remodels. Any remodel that involves moving or replacing plumbing fixtures, adding electrical circuits, or changing the layout requires permits. We coordinate with your local building department and schedule all inspections as part of our service.

For shower walls, large-format porcelain tile is popular — it's durable, water-resistant, and minimizes grout lines. For shower floors, smaller tiles like mosaics provide better traction and accommodate the slope toward the drain. Natural stone like marble is beautiful but requires more maintenance and sealing. We help you choose the right tile for both aesthetics and practicality during your consultation.

Remove all personal items from the bathroom before construction starts. If it's your only bathroom, plan for alternative arrangements during the most disruptive phase (usually 1-2 weeks). Clear a path from the entrance to the bathroom for our crew, and let us know about any parking or access considerations. We handle everything else, including dust containment and cleanup.

Explore Our Other Services

Full-service Bay Area contractor — one team for every part of your home

Related Reading

Helpful guides from our construction blog

Bay Area Cities We Serve

Licensed contractor serving Contra Costa, Alameda & Santa Clara Counties since 2007

Ready to Create Your Dream Bathroom?

Let's discuss your vision and create a bathroom perfect for your lifestyle. Free consultation, no obligation.